Portfolio

Residences at Riverfront Landing lll

Project Details

Residences at Riverfront Landing lll

Property Video – August 2025

Click on image to expand

Residences at Table Talk Square

Project Details

Residences at Table Talk Square

Property Video – October 2025

With the new month, comes a new game plan – Feeney Brothers is shifting from mass excavation to surgical delineation. We met with the environmental consultants, their field inspectors, the LSP, our Trucking and Disposal consultant, and the field staff, and project management team from Feeney Brothers. The goal is to separate out the various areas of the material into piles that can be tested and hauled to a less expensive disposal facility. While this takes time, is saves the project significant money in needless landfill charges. While this is ongoing, HB Fleming is installing walers, and soils anchors, while their carpenters are continuing with the timber lagging. All this work will pay huge dividends, when we are able to save close to 2-3 months of General Requirements of our soon-to-be-selected General Contractor, and they are able to immediately mobilize for foundations.

Property Video – September 2025

Feeney Brothers is enjoying a string of great weather. They have been hauling soils since the first week in September, and have only lost a couple days to rain, and a couple days to coordination with Polar Park. HB Fleming has increased their crew, and now have men installing timber lagging, men drilling soil anchors, and a crew prepping to install the walers that will support the soils anchors. The team from Joh Turner Consulting are working on sampling the soils to decide what facility is the most efficient location for each type of soils we have left. Our expectation is that in a couple weeks, the entire site will be dug down to the subgrade in order for our selected General Contractor to start with the foundations immediately.

Property Video – September 2025

How do you make a mole hill out of a mountain? Hire Feeney Brothers to haul 30,000 tons of export, and HB Fleming to create a Support of Excavation system to hold back up to 24 feet of public roadways, and existing utilities. So far, in the last couple of weeks, Feeney Brother has hauled over 22,000 tons of material and have less than 1/3 of the pile to go. Before you know it, we will be placing footings, and foundation walls.

Click on image to expand

Ellis Factory Lofts

Project Details

Ellis Factory Lofts

Property Video – November 2024

Welcome to the SMC’s newest acquisition in Haverhill, MA – Ellis Factory Lofts. This property boasts 59 Market Rate apartments in the exciting area of Haverhill. This area along the Merrimack River has seen significant growth, and improvement in the past decade, including a thriving restaurant and nightclub scene, and a robust commercial infusion downtown. The E. F. Lofts has three very unique commercial spaces on the lower level. This property includes a fully outfitted exercise space, a great community room, commercial laundry facilities, and an outdoor patio with a fire pit, grille area, and seating to gather with your friends & neighbors.

Click on image to expand

Residences on Madison

Project Details

Residences on Madison

Property Video – September 2025

This might seem like a little photo – but this is a huge milestone for Bozzuto and our team, who have been working tirelessly for over a year to get these transformers delivered to our project at 5 Madison Street, in Worcester, MA. Now the race is on the get the permanent power turned on, and commission our HVAC systems by the end of the year. SMC Management’s 102 unit Market Rate apartment project has been designed by Market Square Architects, and BLW Engineers, and is just one of many projects in the country that is pushing to have the HVAC system up and running before the EPA deadline for the change in refrigerant on 01/01/2026.

Property Video – September 2025

Bozzuto Construction has placed the infill slab at our outdoor courtyard, and will be waterproofing it as soon as the concrete cures. The team of siding & brick subcontractors, manufacturers’ reps, the architects, Bozzuto superintendents & managers, and ownership have been reviewing mock-ups of brick, vertical siding, panels, and horizontal siding, as well as flashing details & colors, and sequencing of this work. Inside, all the trades have completed their municipal inspections on the 2nd & 3rd floor, for rough-in – as well as firestopping. Now the drywaller can “stock” the job and start hanging the boards next week.

Property Video – August 2025

Bozzuto started framing this building the first week of May. Now, in the last week of August, the roof is on (with rooftop condensers mostly installed); the windows & sliders are in; the MEPS subcontractors are calling for rough-in inspections, and by the end of next week, the drywallers will start with the first batch of apartments. The team has held Pre-Installation Meetings with the Gyp-Crete, Flooring, Paint & Wallpaper subs, and Bozzuto has confirmed all materials are procured with no impacts due to tariffs, or availability.

Click on image to expand

Poet Hill Residences

Project Details

Poet Hill Residences

Property Video – August 2025

Callahan Construction has wrapped up the building siding and the waterproofing crew has completed the flood testing of the courtyard patio area. the landscaper has installed the root barrier, and now will install the drainage mat prior to the stone base for the entire courtyard pavers. The concrete crew will be placing the concrete ramp and the last of the fence post supports. Inside the building, the full spectrum of construction can be witnessed by walking from Block A – where the MEPS subs are finishing the rough-in; to Block B – where the drywallers & painters are finishing up; to Block C where the cabinets, counters, and trim are being installed, to Block D where the punchlist crew, and final cleaning crew is putting the shine on these spectacular units.

Property Video – July 2025

Callahan Construction is progressing with the retaining walls, and the hot-applied waterproofing in the Courtyard. Each area of concrete (light bollards, retaining walls, Bocce Ball Court,…) is drilled & pinned to the concrete slab, then meticulously waterproofed, before the concrete is placed – thus, providing a complete barrier between the layers of concrete & ensuring our garage is water-free for a long time. Along the Eastern side of the building, the foundation crew is forming the last two areaways for the ventilation system, and on the Western side of the building, the siding crew is about 1/2 done with this elevation. Son, the last of the earthwork, and siding work will be completed, and we will be ready for the staff to get set-up.

Property Video – May 2025

It’s hard to miss the Callahan Construction banner as you approach Worcester from I-190 or I-290. SMC Management’s Poet Hill Place project is difficult to see behind the banner – but it’s there 🙂 By the beginning of next year, 201 Class A, Market Rate apartments will be available over the double parking podium. The color scheme looks beautiful & adds a contemporary feel to this well established Worcester neighborhood.

Click on image to expand

Monadnock Place

Project Details

Monadnock Place

Property Video – September 2024

Aberthaw Construction is progressing towards an Occupancy Permit by the end of September – just in time to start leasing in early October. Preparations are underway for final paving next week, and the MEPS trade partners are busy wrapping up the start-ups & punchlist for all the finishes in the 80 unit, Market Rate project.

Property Video – August 2023

Aberthaw Construction is progressing quickly towards an Occupancy Permit in mid-late September. Their landscapers are installing plantings, and the site contractor is wrapping up the sidewalks, and getting ready to final pave the project. With finishes being completed, the interior designers are getting ready to install the FF&E in the Community Spaces, the Leasing Offices, and the Model Unit.

Property Video – March 2024

The team of roofers, framers, and siding installation subcontracts have the building weather-tight, and the MEPS subcontractors have completed the rough-in for the first ½ of the main floor level.  The painters have painted the ceilings, and primed the walls.  This has allowed the gypsum subfloor crew to prep for installation of Gyp-Crete – which will be installed by the time this video airs.

Click on image to expand

Residences at Hadley Falls

Project Details

Residences at Hadley Falls

Construction Drone – MAY 2024

Construction Drone – MARCH 2024

Construction Drone – OCTOBER 2023

Click on image to expand

Taylor Pointe

Project Details

Taylor Pointe

Construction Drone – November 2024

We have obtained the Temporary Certificate of Occupancy for 3 Sanders Street (full Cert of Occup expected on Tuesday of next week). This clears the way for our Management Team to start leasing units. 5 Sanders Street is right behind this building, but the lack of staffing in the Inspectional Departments in Nashua will push the full acceptance off until just before Thanksgiving. IN the meantime, the contractor will be finishing the completion of the units in 6 Sanders Street, and hopes to have the Certificate of Occupancy by and the project completion) by mid-December.

Construction Drone – September 2024

Sitework at Taylor Pointe is moving along, Sidewalks are being complete. Patios are being prepped for brick pavers, and landscapers are installing irrigation system – plantings are scheduled to be installed by the end of the month. On the interior of all the buildings, the fire alarms are being tested, elevators are being adjusted, and Final Inspections are being lined up.

Construction Drone – August 2024

The contractor is moving towards the obtaining the first Certificate of Occupancy for 4 Sanders Street, and 5 Sanders Street. Once those Certificates are obtained, then 6 Sanders Street will follow roughly one month later. The curbing, and sidewalks are being installed, and landscaping will start by the end of the month.

Click on image to expand

enVision Hotel Boston Everett

Project Details

enVision Hotel Boston Everett

Aerial Video of Property
Click on image to expand

The Parc at HaborView Senior Living

Project Details

The Parc at HaborView Senior Living

Click on image to expand

The Residences at Sundial Center

Project Details

The Residences at Sundial Center

Aerial Video Update – JUNE 2019
Aerial Video of Property
Click on image to expand

Residences at Edgebrook
SOLD

Project Details

Residences at Edgebrook

Construction Drone – JUNE 2022

Construction Drone – FEBRUARY 2022

Construction Drone – January 2022

Residences at Soldiers Field Road
SOLD

Project Details

Residences at Soldiers Field Road

Construction Drone – JUNE 2022

Construction Drone – MARCH 2022

Construction Drone – MARCH 2022

Click on image to expand

Residences at Cross Point Towers
SOLD

Project Details

Residences at Cross Point Towers

Construction Drone – JANUARY 2021

Construction Drone – DECEMBER 2020

Construction Drone – JULY 2020

Click on image to expand

Residences at Executive Park Drive
SOLD

Project Details

Residences at Hadley Falls

Construction Video Update –
OCTOBER 2021

Click on image to expand

Mill 240
SOLD

Project Details

Mill 240 – Loft Style Apartments and Self Storage

Aerial Video Update – NOVEMBER 2019
Aerial Video Update – MARCH 2018

Click on images to expand

Terraces at Cranston
SOLD

Project Details

Terraces at Cranston

Click on image to expand

Residences at Riverfront Landing
SOLD

Project Details

Residences at Riverfront Landing

Aerial Video Update – OCTOBER 2019
Aerial Video Update – MAY 2019
Click on image to expand

Waterford Place Apartments
SOLD

Project Details

Waterford Place Apartments​

Click on image to expand

Holiday Inn Mansfield
SOLD

Project Details

Holiday Inn Mansfield

Aerial Video of Property

Riverwalk Apartments
SOLD

Project Details

Riverwalk Apartments

Aerial Video Update – OCTOBER 2019
Aerial Video Update – MAY 2019
Click on image to expand

Washington Mills Apartments
SOLD

Project Details

Washington Mills Apartments

Click on image to expand

Residences at Brentwood
SOLD

Project Details

Residences at Brentwood

Click on image to expand

Wellington Parkside Apartments
SOLD

Project Details

Wellington Parkside Apartments

Click on image to expand

The 903 Residences
SOLD

Project Details

The 903 Residences

Click on image to expand

University Heights
SOLD

Project Details

University Heights

Click on image to expand

Timberwood Commons
SOLD

Project Details

Timberwood Commons

Click on image to expand

EnVision Hotel Boston
SOLD

Project Details

EnVision Hotel Boston

Click on image to expand

Oak Knoll Condominium
SOLD

Project Details

Oak Knoll Condominium

Click on image to expand

33-41 West Street
SOLD

Project Details

33-41 West Street

Click on image to expand

Park Plaza
SOLD

Project Details

Park Plaza

Click on image to expand

Quarrywood Green
SOLD

Project Details

Quarrywood Green

Click on image to expand

Penacook Village
SOLD

Project Details

Penacook Village

Click on image to expand

Woodland and Oak
SOLD

Project Details

Woodland and Oak

Click on image to expand

Stone Terrace
SOLD

Project Details

Stone Terrace

Click on image to expand

Aspen Riverbend
SOLD

Project Details

Aspen Riverbend

Click on image to expand

Houston, TX Portfolio
SOLD

Project Details

Houston, TX Portfolio

Click on image to expand

Emerson Gardens
SOLD

Project Details

Emerson Gardens

Click on image to expand