Portfolio

Ellis Factory Lofts

Project Details

Ellis Factory Lofts

Click on image to expand

Residences on Madison

Project Details

Residences on Madison

Property Video – November 2024

Bozzuto Construction is working with Sea & Shore to install the Support of Excavation (SOE) along the existing foundation, which will allow the team to install foundations in December, and Structural Steel in January. Market Square Architects has designed another fabulous project with 102 market-rate apartments over a podium – which will house the Leasing Office, and Community Space.

Property Video – October 2024

Bozzuto Construction has broken ground on our newest project in Worcester. This project will have 102 Market Rate apartments over a parking podium and Leasing Office/Community Space. This project will also feature an electric vault since the site is so constrained there is no place to locate the transformer on the site. Market Square Architects and Michael D’Angelo Landscape Architects also designed a spectacular elevated courtyard patio space. We expect to have this project completed by February 2026.

Property Video – July 2023

Click on image to expand

Poet Hill Residences

Project Details

Poet Hill Residences

Property Video – November 2024

Callahan Construction Managers, and their trade partners are building momentum. Shawnlee Construction has reached the fourth floor trusses in Zone D, and started framing Zone C (by the end of the month, they will be topped off in D, and will have started on one B). On the upper level of the garage, the fire-proofers are spraying the structural steel, and the plumbers and fire protection subs are running their piping. On the lower level, the Superior Plumbing is wrapping up the underground, and the slabs are being prepped to the first placement next week.

Property Video – October 2024

Shrouded in a light mist, Poet Hill is starting to head for the clouds. Callahan Construction has completed all the elevated slabs, and next week they will start placing the slab on grade for the lower parking level. Meanwhile, the carpenters are working on the first block of units (Block D); after they complete the third floor framing, they will bring on board another crew to start framing the Block C units. The Fire Protection sub has tied in the sprinkler main, and is installing the complete system in tandem with the framers – so the building has full fire suppression protection all during construction.

Property Video – September 2024

The Steel Erectors are moving along at Poet Hill, in Worcester, MA. The first slab placement on the elevated deck, and the Courtyard are complete, and the crew will be placing slabs non-stop for the next few weeks until complete. Callahan Construction Manager’s framing sub is scheduled to start within the month, and the site contractor has paved most of the site with binder course to make driving around, and parking for the subcontractors easier.

Click on image to expand

Monadnock Place

Project Details

Monadnock Place

Property Video – September 2024

Aberthaw Construction is progressing towards an Occupancy Permit by the end of September – just in time to start leasing in early October. Preparations are underway for final paving next week, and the MEPS trade partners are busy wrapping up the start-ups & punchlist for all the finishes in the 80 unit, Market Rate project.

Property Video – August 2023

Aberthaw Construction is progressing quickly towards an Occupancy Permit in mid-late September. Their landscapers are installing plantings, and the site contractor is wrapping up the sidewalks, and getting ready to final pave the project. With finishes being completed, the interior designers are getting ready to install the FF&E in the Community Spaces, the Leasing Offices, and the Model Unit.

Property Video – March 2024

The team of roofers, framers, and siding installation subcontracts have the building weather-tight, and the MEPS subcontractors have completed the rough-in for the first ½ of the main floor level.  The painters have painted the ceilings, and primed the walls.  This has allowed the gypsum subfloor crew to prep for installation of Gyp-Crete – which will be installed by the time this video airs.

Click on image to expand

Residences at Hadley Falls

Project Details

Residences at Hadley Falls

Construction Drone – MAY 2024

Construction Drone – MARCH 2024

Construction Drone – OCTOBER 2023

Click on image to expand

Taylor Pointe

Project Details

Taylor Pointe

Construction Drone – November 2024

We have obtained the Temporary Certificate of Occupancy for 3 Sanders Street (full Cert of Occup expected on Tuesday of next week). This clears the way for our Management Team to start leasing units. 5 Sanders Street is right behind this building, but the lack of staffing in the Inspectional Departments in Nashua will push the full acceptance off until just before Thanksgiving. IN the meantime, the contractor will be finishing the completion of the units in 6 Sanders Street, and hopes to have the Certificate of Occupancy by and the project completion) by mid-December.

Construction Drone – September 2024

Sitework at Taylor Pointe is moving along, Sidewalks are being complete. Patios are being prepped for brick pavers, and landscapers are installing irrigation system – plantings are scheduled to be installed by the end of the month. On the interior of all the buildings, the fire alarms are being tested, elevators are being adjusted, and Final Inspections are being lined up.

Construction Drone – August 2024

The contractor is moving towards the obtaining the first Certificate of Occupancy for 4 Sanders Street, and 5 Sanders Street. Once those Certificates are obtained, then 6 Sanders Street will follow roughly one month later. The curbing, and sidewalks are being installed, and landscaping will start by the end of the month.

Click on image to expand

Residences at Edgebrook

Project Details

Residences at Edgebrook

Construction Drone – JUNE 2022

Construction Drone – FEBRUARY 2022

Construction Drone – January 2022

Residences at Cross Point Towers

Project Details

Residences at Cross Point Towers

Construction Drone – JANUARY 2021

Construction Drone – DECEMBER 2020

Construction Drone – JULY 2020

Click on image to expand

enVision Hotel Boston Everett

Project Details

enVision Hotel Boston Everett

Aerial Video of Property
Click on image to expand

The Residences at Sundial
Center

Project Details

The Residences at Sundial Center

Aerial Video Update – JUNE 2019
Aerial Video of Property
Click on image to expand

Terraces at Cranston
 

Project Details

Terraces at Cranston

Click on image to expand

Residences at Brentwood

Project Details

Residences at Brentwood

Click on image to expand

The Parc at HaborView Senior Living

Project Details

The Parc at HaborView Senior Living

Click on image to expand

The 903 Residences

Project Details

The 903 Residences

Click on image to expand