Portfolio
Ellis Factory Lofts
Ellis Factory Lofts
Property Video – November 2024
Welcome to the SMC’s newest acquisition in Haverhill, MA – Ellis Factory Lofts. This property boasts 59 Market Rate apartments in the exciting area of Haverhill. This area along the Merrimack River has seen significant growth, and improvement in the past decade, including a thriving restaurant and nightclub scene, and a robust commercial infusion downtown. The E. F. Lofts has three very unique commercial spaces on the lower level. This property includes a fully outfitted exercise space, a great community room, commercial laundry facilities, and an outdoor patio with a fire pit, grille area, and seating to gather with your friends & neighbors.
Residences on Madison
Residences on Madison
Property Video – January 2025
With the soils exported from SMC’s newest 102 unit Market Rate apartment project, the Residences on Madison, in Worcester, MA., the foundation crew has been able to start forming the foundation footings. The crew has begun on both the Western wall (along the back of the property), and the Eastern wall along Madison Street. Sea & Shore has installed the piles in the Southwestern corner, and now that the City has granted approval, they will be moving along the Southern wall (along Beacon Street). Meanwhile Bozzuto Construction has the majority of their Construction Management Plan in place, which will give them the room along the public ways to complete the project.
Property Video – December 2024
At 5 Madison Street – SMC Management’s newest project in Worcester, MA, Bozzuto Construction has gotten the all-clear to remove the special soils & has removed approximately half of the stockpiles in just one day. By next Monday, they will have removed all the soils necessary to give the foundation crew a clear path to place the footings along the existing rear wall, and the wall along Madison Street. Sea & Shore has completed the SOE along the West wall, and is ready to move along Beacon Street to the South.
Property Video – December 2024
At SMC’s newest project in Worcester, MA (the Residences on Madison), Bozzuto has completed the Support of Excavation (SOE) along existing foundation wall; and is progressing towards Beacon Street. The site contractor is prepping for the start of foundations along Madison and the rear building wall. The complications of the existing soils are almost done with, and that should open up the schedule to really get going. We are looking forward to a short break for the holidays, and a very productive New Year.
Poet Hill Residences
Poet Hill Residences
Property Video – January 2025
Check out the framing of SMC’s first project in Worcester – Residences at Poet Hill. Callahan and their trade partners are pushing through the cold, and making great headway towards getting more roofing installed. Meanwhile, the siding crews are installing windows, sliders, and Tyvek Building Wrap.
Property Video – January 2025
It’s a pretty chilly day here at Poet Hill in Worcester Ma. Callahan Construction’s roofers have Block D watertight; and the framers are pushing ahead with framing the roof in Block C; and the 4th floor wall panels in Block B; and walls on the 1st floor of Block A. In both levels of the garage, the MEPS subs continue to rough-in, while the spray-fireproofing is wrapping up.
Property Video – December 2024
As we close out the year at Poet Hill Residences in Worcester, MA. Callahan Construction has reached the roof in Block D; Is framing the walls on Flr 5 in Block C; 3rd Floor trusses in Block B; and starting the walls on the deck of Block A. HP Fleming is removing the last of the rakers of the SOE, and the MEPS subs are roughing in both levels of the garages. Well Done team, and we look forward to an incredible 2025.
Monadnock Place
Monadnock Place
Property Video – September 2024
Aberthaw Construction is progressing towards an Occupancy Permit by the end of September – just in time to start leasing in early October. Preparations are underway for final paving next week, and the MEPS trade partners are busy wrapping up the start-ups & punchlist for all the finishes in the 80 unit, Market Rate project.
Property Video – August 2023
Aberthaw Construction is progressing quickly towards an Occupancy Permit in mid-late September. Their landscapers are installing plantings, and the site contractor is wrapping up the sidewalks, and getting ready to final pave the project. With finishes being completed, the interior designers are getting ready to install the FF&E in the Community Spaces, the Leasing Offices, and the Model Unit.
Property Video – March 2024
The team of roofers, framers, and siding installation subcontracts have the building weather-tight, and the MEPS subcontractors have completed the rough-in for the first ½ of the main floor level. The painters have painted the ceilings, and primed the walls. This has allowed the gypsum subfloor crew to prep for installation of Gyp-Crete – which will be installed by the time this video airs.
Residences at Hadley Falls
Residences at Hadley Falls
Construction Drone – MAY 2024
Construction Drone – MARCH 2024
Construction Drone – OCTOBER 2023
Taylor Pointe
Taylor Pointe
Construction Drone – November 2024
We have obtained the Temporary Certificate of Occupancy for 3 Sanders Street (full Cert of Occup expected on Tuesday of next week). This clears the way for our Management Team to start leasing units. 5 Sanders Street is right behind this building, but the lack of staffing in the Inspectional Departments in Nashua will push the full acceptance off until just before Thanksgiving. IN the meantime, the contractor will be finishing the completion of the units in 6 Sanders Street, and hopes to have the Certificate of Occupancy by and the project completion) by mid-December.
Construction Drone – September 2024
Sitework at Taylor Pointe is moving along, Sidewalks are being complete. Patios are being prepped for brick pavers, and landscapers are installing irrigation system – plantings are scheduled to be installed by the end of the month. On the interior of all the buildings, the fire alarms are being tested, elevators are being adjusted, and Final Inspections are being lined up.
Construction Drone – August 2024
The contractor is moving towards the obtaining the first Certificate of Occupancy for 4 Sanders Street, and 5 Sanders Street. Once those Certificates are obtained, then 6 Sanders Street will follow roughly one month later. The curbing, and sidewalks are being installed, and landscaping will start by the end of the month.
Residences at Edgebrook
Residences at Edgebrook
Construction Drone – JUNE 2022
Construction Drone – FEBRUARY 2022
Construction Drone – January 2022
- Location: Merrimack, New Hampshire
- Type: 230 Units – Class A Apartments
- Status: Market Rate Rental – New Construction
- Misc: Construction started Winter 2019
- Website: Coming Soon
Residences at Cross Point Towers
Residences at Cross Point Towers
Construction Drone – JANUARY 2021
Construction Drone – DECEMBER 2020
Construction Drone – JULY 2020
enVision Hotel Boston Everett
enVision Hotel Boston Everett
- Location: 1834 Revere Beach Parkway Everett, MA
- Type: 101 Room Boutique Hotel (“enVision Hotel” – A Choice Hotels Ascend Collection Brand)
- Status: Renovation of existing structure
- Misc: Opened April 2017
The Residences at Sundial
Center
The Residences at Sundial Center
- Location: Sundial Avenue
Manchester, New Hampshire
- Type: 135 Units class A apartment Units. 120,000 SF Renovation of South Wing into 87 Class A loft style apartments. 48 units of newly constructed class A apartments.
- Status: Opened May 2017
- Misc: Located at: The Sundial Center of Commerce and Education
240,000 SF – Commercial/Industrial Development Office, R&D and Flex Space
Terraces at Cranston
Terraces at Cranston
- Location: Cranston, Rhode Island
- Type: 216 Units – Class A Apartments
- Status: Market Rate Rental
- Misc: Value Add
Residences at Brentwood
Residences at Brentwood
- Location: Providence, Rhode Island
- Type: 240 Units – Class A Apartments
- Status: Market Rate Rental
- Misc: Value Add
The Parc at HaborView Senior Living
The Parc at HaborView Senior Living
- Location: 46 Lincoln Street Winthrop, MA. 02152
- Type: 90 Units – Senior Assisted Living
- Status: Rehab of Former Winthrop Hospital
- Misc: Opened January, 2015
The 903 Residences
The 903 Residences
- Location: Providence, Rhode Island
- Type: 231 Units – Luxury Condominiums
- Status: Market Rate Rental
- Misc: Selling Condominiums Individually