Portfolio
Ellis Factory Lofts
Ellis Factory Lofts
Property Video – November 2024
Welcome to the SMC’s newest acquisition in Haverhill, MA – Ellis Factory Lofts. This property boasts 59 Market Rate apartments in the exciting area of Haverhill. This area along the Merrimack River has seen significant growth, and improvement in the past decade, including a thriving restaurant and nightclub scene, and a robust commercial infusion downtown. The E. F. Lofts has three very unique commercial spaces on the lower level. This property includes a fully outfitted exercise space, a great community room, commercial laundry facilities, and an outdoor patio with a fire pit, grille area, and seating to gather with your friends & neighbors.
Residences on Madison
Residences on Madison
Property Video – December 2024
At SMC’s newest project in Worcester, MA (the Residences on Madison), Bozzuto has completed the Support of Excavation (SOE) along existing foundation wall; and is progressing towards Beacon Street. The site contractor is prepping for the start of foundations along Madison and the rear building wall. The complications of the existing soils are almost done with, and that should open up the schedule to really get going. We are looking forward to a short break for the holidays, and a very productive New Year.
Property Video – November 2024
Bozzuto Construction is working with Sea & Shore to install the Support of Excavation (SOE) along the existing foundation, which will allow the team to install foundations in December, and Structural Steel in January. Market Square Architects has designed another fabulous project with 102 market-rate apartments over a podium – which will house the Leasing Office, and Community Space.
Property Video – October 2024
Bozzuto Construction has broken ground on our newest project in Worcester. This project will have 102 Market Rate apartments over a parking podium and Leasing Office/Community Space. This project will also feature an electric vault since the site is so constrained there is no place to locate the transformer on the site. Market Square Architects and Michael D’Angelo Landscape Architects also designed a spectacular elevated courtyard patio space. We expect to have this project completed by February 2026.
Poet Hill Residences
Poet Hill Residences
Property Video – December 2024
Callahan Construction is reaching for the roof in Block D; decking the 5th floor in Block C; finishing the 4th floor trusses in Block B; and landing panels for the 1st floor in Block A. On the inside of the courtyard, Shawnlee is working on the sheathing punchlist, and have completed the mock-up of the hot-applied waterproofing, flashing, and installation of a slider, and window. Inside the units, Optiline is concentrating on pre-rock locations, and framing the interior walls of the apartments. This is allowing Atlantis Comfort Systems (HVAC sub), and Superior Plumbing to get a jump on the MEPS rough-in, while A & E Fire Protection is installing the sprinklers.
Property Video – November 2024
Callahan Construction Managers, and their trade partners are building momentum. Shawnlee Construction has reached the fourth floor trusses in Zone D, and started framing Zone C (by the end of the month, they will be topped off in D, and will have started on one B). On the upper level of the garage, the fire-proofers are spraying the structural steel, and the plumbers and fire protection subs are running their piping. On the lower level, the Superior Plumbing is wrapping up the underground, and the slabs are being prepped to the first placement next week.
Property Video – October 2024
Shrouded in a light mist, Poet Hill is starting to head for the clouds. Callahan Construction has completed all the elevated slabs, and next week they will start placing the slab on grade for the lower parking level. Meanwhile, the carpenters are working on the first block of units (Block D); after they complete the third floor framing, they will bring on board another crew to start framing the Block C units. The Fire Protection sub has tied in the sprinkler main, and is installing the complete system in tandem with the framers – so the building has full fire suppression protection all during construction.
Monadnock Place
Monadnock Place
Property Video – September 2024
Aberthaw Construction is progressing towards an Occupancy Permit by the end of September – just in time to start leasing in early October. Preparations are underway for final paving next week, and the MEPS trade partners are busy wrapping up the start-ups & punchlist for all the finishes in the 80 unit, Market Rate project.
Property Video – August 2023
Aberthaw Construction is progressing quickly towards an Occupancy Permit in mid-late September. Their landscapers are installing plantings, and the site contractor is wrapping up the sidewalks, and getting ready to final pave the project. With finishes being completed, the interior designers are getting ready to install the FF&E in the Community Spaces, the Leasing Offices, and the Model Unit.
Property Video – March 2024
The team of roofers, framers, and siding installation subcontracts have the building weather-tight, and the MEPS subcontractors have completed the rough-in for the first ½ of the main floor level. The painters have painted the ceilings, and primed the walls. This has allowed the gypsum subfloor crew to prep for installation of Gyp-Crete – which will be installed by the time this video airs.
Residences at Hadley Falls
Residences at Hadley Falls
Construction Drone – MAY 2024
Construction Drone – MARCH 2024
Construction Drone – OCTOBER 2023
Taylor Pointe
Taylor Pointe
Construction Drone – November 2024
We have obtained the Temporary Certificate of Occupancy for 3 Sanders Street (full Cert of Occup expected on Tuesday of next week). This clears the way for our Management Team to start leasing units. 5 Sanders Street is right behind this building, but the lack of staffing in the Inspectional Departments in Nashua will push the full acceptance off until just before Thanksgiving. IN the meantime, the contractor will be finishing the completion of the units in 6 Sanders Street, and hopes to have the Certificate of Occupancy by and the project completion) by mid-December.
Construction Drone – September 2024
Sitework at Taylor Pointe is moving along, Sidewalks are being complete. Patios are being prepped for brick pavers, and landscapers are installing irrigation system – plantings are scheduled to be installed by the end of the month. On the interior of all the buildings, the fire alarms are being tested, elevators are being adjusted, and Final Inspections are being lined up.
Construction Drone – August 2024
The contractor is moving towards the obtaining the first Certificate of Occupancy for 4 Sanders Street, and 5 Sanders Street. Once those Certificates are obtained, then 6 Sanders Street will follow roughly one month later. The curbing, and sidewalks are being installed, and landscaping will start by the end of the month.
Residences at Edgebrook
Residences at Edgebrook
Construction Drone – JUNE 2022
Construction Drone – FEBRUARY 2022
Construction Drone – January 2022
- Location: Merrimack, New Hampshire
- Type: 230 Units – Class A Apartments
- Status: Market Rate Rental – New Construction
- Misc: Construction started Winter 2019
- Website: Coming Soon
Residences at Cross Point Towers
Residences at Cross Point Towers
Construction Drone – JANUARY 2021
Construction Drone – DECEMBER 2020
Construction Drone – JULY 2020
enVision Hotel Boston Everett
enVision Hotel Boston Everett
- Location: 1834 Revere Beach Parkway Everett, MA
- Type: 101 Room Boutique Hotel (“enVision Hotel” – A Choice Hotels Ascend Collection Brand)
- Status: Renovation of existing structure
- Misc: Opened April 2017
The Residences at Sundial
Center
The Residences at Sundial Center
- Location: Sundial Avenue
Manchester, New Hampshire
- Type: 135 Units class A apartment Units. 120,000 SF Renovation of South Wing into 87 Class A loft style apartments. 48 units of newly constructed class A apartments.
- Status: Opened May 2017
- Misc: Located at: The Sundial Center of Commerce and Education
240,000 SF – Commercial/Industrial Development Office, R&D and Flex Space
Terraces at Cranston
Terraces at Cranston
- Location: Cranston, Rhode Island
- Type: 216 Units – Class A Apartments
- Status: Market Rate Rental
- Misc: Value Add
Residences at Brentwood
Residences at Brentwood
- Location: Providence, Rhode Island
- Type: 240 Units – Class A Apartments
- Status: Market Rate Rental
- Misc: Value Add
The Parc at HaborView Senior Living
The Parc at HaborView Senior Living
- Location: 46 Lincoln Street Winthrop, MA. 02152
- Type: 90 Units – Senior Assisted Living
- Status: Rehab of Former Winthrop Hospital
- Misc: Opened January, 2015
The 903 Residences
The 903 Residences
- Location: Providence, Rhode Island
- Type: 231 Units – Luxury Condominiums
- Status: Market Rate Rental
- Misc: Selling Condominiums Individually