Portfolio
Residences at Table Talk Square

Residences at Table Talk Square
Property Video – January 2025
SMC Management Corp.’s next project in Worcester, MA will be a fantastic, 185-unit, Market Rate building constructed over a double parking podium; situated across the street from Polar Park baseball field. Market Square Architects has been working on the design along with the team from Bohler. Together with Rich Mazzocchi from Tremont Development Partners, the team has successfully obtained the Final Site Plan approval from Worcester Planning Board; and we expect to be soliciting proposals this summer for its construction. The project should be completed and ready for occupancy by early Fall 2027.
Ellis Factory Lofts

Ellis Factory Lofts
Property Video – November 2024
Welcome to the SMC’s newest acquisition in Haverhill, MA – Ellis Factory Lofts. This property boasts 59 Market Rate apartments in the exciting area of Haverhill. This area along the Merrimack River has seen significant growth, and improvement in the past decade, including a thriving restaurant and nightclub scene, and a robust commercial infusion downtown. The E. F. Lofts has three very unique commercial spaces on the lower level. This property includes a fully outfitted exercise space, a great community room, commercial laundry facilities, and an outdoor patio with a fire pit, grille area, and seating to gather with your friends & neighbors.
Residences on Madison

Residences on Madison
Property Video – February 2025
At The Residences on Madison, SMC’s 102 unit Class A, Market Rate project in the heart of Worcester, Bozzuto Construction continues to battle winter on one hand, and challenging soils issues on the other. One half of the high foundation walls are complete, and the foundation crew is expected to be wrapped up by the end of February. This will be just in time for the structural steel crew to start erecting the podium for the second floor; and the framing crew is anticipated to start by the end of March. As warmer weather approaches, the site crew will focus turn their focus to utility work, and improvements along Madison Street, and Beacon Street.
Property Video – January 2025
Things are moving along at the RESIDENCES ON MADISON – SMC’s 102 unit, Market Rate project in Worcester, MA. The Greener Group (Bozzuto’s site contractor), and Sea & Shore (their SOE subcontractor) have installed the last of the piles, and are working together to install the lagging, which will allow the team to excavation down to the footing grade. From there, Form-Up Foundations can place the concrete along the balance of the exterior walls. Next month, we expect the steel crew to be erecting the structural steel.
Property Video – January 2025
If you are in the Worcester, MA area, near Polar Park, swing by SMC’s Residences on Madison project. This 102 unit Market Rate project is being constructed by Bozzuto, and has been designed by Market Square Architects. The foundation crew is almost 1/2 way done, while Sea & Shore is continuing with the piles & lagging along Beacon Street. Steel is scheduled for next month, and wood framing will start in March.
Poet Hill Residences

Poet Hill Residences
Property Video – February 2025
The temperatures at Poet Hill Place hasn’t seen “bearable” weather for over a week – and have we mentioned that its windy on top of this hill? Callahan Construction hasn’t been able to fly trusses, or effectively use the boom lifts due to the cold & wind. Meanwhile inside, the MEPS crews are moving ahead with rough-ins & are expecting the municipal inspections in the next few days in order to start drywall next week.
Property Video – February 2025
No matter which direction you approach Poet Hill Place from, it is apparent that this is one of Worcester’s most impressive project. SMC’s 210 unit project commands the horizon from every angle. Callahan Construction has reached the roof on over half of the project, and the MEPS trade partners are working feverously to complete their rough-in activities in the first zone (Zone “D”) of the building. The roofers, and air/vapor barrier & window crews are drying in Block “C”, while the framers are busy setting trusses & wall panels on the upper floors of Block “B”, and on the third floor of Block “A”.
Property Video – January 2025
In the cold winds of Worcester, MA Callahan Construction are pressing on with the framing of SMC’s Residences at Poet Hill. With roughly 150 trade partners working in unison, the roofers have completed the TPO on Block “D”, and has stocked the roof for Block “C”. The MEPS rough-in continues in Blocks “D” & “C”, and the framers are focusing on Blocks “B” & “A”.
Monadnock Place

Monadnock Place
Property Video – September 2024
Aberthaw Construction is progressing towards an Occupancy Permit by the end of September – just in time to start leasing in early October. Preparations are underway for final paving next week, and the MEPS trade partners are busy wrapping up the start-ups & punchlist for all the finishes in the 80 unit, Market Rate project.
Property Video – August 2023
Aberthaw Construction is progressing quickly towards an Occupancy Permit in mid-late September. Their landscapers are installing plantings, and the site contractor is wrapping up the sidewalks, and getting ready to final pave the project. With finishes being completed, the interior designers are getting ready to install the FF&E in the Community Spaces, the Leasing Offices, and the Model Unit.
Property Video – March 2024
The team of roofers, framers, and siding installation subcontracts have the building weather-tight, and the MEPS subcontractors have completed the rough-in for the first ½ of the main floor level. The painters have painted the ceilings, and primed the walls. This has allowed the gypsum subfloor crew to prep for installation of Gyp-Crete – which will be installed by the time this video airs.
Residences at Hadley Falls

Residences at Hadley Falls
Construction Drone – MAY 2024
Construction Drone – MARCH 2024
Construction Drone – OCTOBER 2023
Taylor Pointe

Taylor Pointe
Construction Drone – November 2024
We have obtained the Temporary Certificate of Occupancy for 3 Sanders Street (full Cert of Occup expected on Tuesday of next week). This clears the way for our Management Team to start leasing units. 5 Sanders Street is right behind this building, but the lack of staffing in the Inspectional Departments in Nashua will push the full acceptance off until just before Thanksgiving. IN the meantime, the contractor will be finishing the completion of the units in 6 Sanders Street, and hopes to have the Certificate of Occupancy by and the project completion) by mid-December.
Construction Drone – September 2024
Sitework at Taylor Pointe is moving along, Sidewalks are being complete. Patios are being prepped for brick pavers, and landscapers are installing irrigation system – plantings are scheduled to be installed by the end of the month. On the interior of all the buildings, the fire alarms are being tested, elevators are being adjusted, and Final Inspections are being lined up.
Construction Drone – August 2024
The contractor is moving towards the obtaining the first Certificate of Occupancy for 4 Sanders Street, and 5 Sanders Street. Once those Certificates are obtained, then 6 Sanders Street will follow roughly one month later. The curbing, and sidewalks are being installed, and landscaping will start by the end of the month.
enVision Hotel Boston Everett

enVision Hotel Boston Everett
- Location: 1834 Revere Beach Parkway Everett, MA
- Type: 101 Room Boutique Hotel (“enVision Hotel” – A Choice Hotels Ascend Collection Brand)
- Status: Renovation of existing structure
- Misc: Opened April 2017
The Parc at HaborView Senior Living

The Parc at HaborView Senior Living
- Location: 46 Lincoln Street Winthrop, MA. 02152
- Type: 90 Units – Senior Assisted Living
- Status: Rehab of Former Winthrop Hospital
- Misc: Opened January, 2015
The Residences at Sundial Center

The Residences at Sundial Center
- Location: Sundial Avenue
Manchester, New Hampshire
- Type: 135 Units class A apartment Units. 120,000 SF Renovation of South Wing into 87 Class A loft style apartments. 48 units of newly constructed class A apartments.
- Status: Opened May 2017
- Misc: Located at: The Sundial Center of Commerce and Education
240,000 SF – Commercial/Industrial Development Office, R&D and Flex Space
Residences at Edgebrook
SOLD

Residences at Edgebrook
Construction Drone – JUNE 2022
Construction Drone – FEBRUARY 2022
Construction Drone – January 2022
- Location: Merrimack, New Hampshire
- Type: 230 Units – Class A Apartments
- Status: Market Rate Rental – New Construction
- Misc: Construction started Winter 2019
- Website: Coming Soon

Residences at Soldiers Field Road
SOLD

Residences at Soldiers Field Road
Construction Drone – JUNE 2022
Construction Drone – MARCH 2022
Construction Drone – MARCH 2022
Residences at Cross Point Towers
SOLD

Residences at Cross Point Towers
Construction Drone – JANUARY 2021
Construction Drone – DECEMBER 2020
Construction Drone – JULY 2020
Mill 240
SOLD

Mill 240 – Loft Style Apartments and Self Storage
- Location: Lawrence, Massachusetts
Next door to, sharing parking and sister property with Washington Mills Lofts
- Type: 200 Class A Loft Style Apartments
Self Storage – 80,000 SF of Mini Self Storage and Larger Storage
- Status: Market Rate Rental – Renovation
- Misc: Opening June 2018
Terraces at Cranston
SOLD

Terraces at Cranston
- Location: Cranston, Rhode Island
- Type: 216 Units – Class A Apartments
- Status: Market Rate Rental
- Misc: Value Add
Residences at Riverfront Landing
SOLD

Residences at Riverfront Landing
- Location: Nashua, New Hampshire
- Type: 159 Units – Class A Apartments
- Status: Market Rate Rental – New Construction
- Misc: Opened February 2018
Waterford Place Apartments
SOLD

Waterford Place Apartments
- Location: Manchester, New Hampshire
- Misc: Purchased in December 2015
- Type: 159 384 Units – Class A Apartments
- Status: Market Rate Rental
- Misc: Value Add
- Misc: Sold June 2019
Holiday Inn Mansfield
SOLD

Holiday Inn Mansfield
- Location: Mansfield, Massachusetts
- Type: 204 Room Regional Holiday Inn Forbes Business Park – Gillette Stadium Market
- Status: Open
- Misc: Value Add
Washington Mills Apartments
SOLD

Washington Mills Apartments
- Location: Lawrence, Massachusetts
- Type: 155 Units – Class A Loft Style Apartments
- Status: Market Rate Rental
- Misc: Value Add
Residences at Brentwood
SOLD

Residences at Brentwood
- Location: Providence, Rhode Island
- Type: 240 Units – Class A Apartments
- Status: Market Rate Rental
- Misc: Value Add
Wellington Parkside Apartments
SOLD

Wellington Parkside Apartments
- Location: Everett, Massachusetts
- Type: 190 Units – Class A Apartments
- Status: Market Rate Rental
- Misc: New Construction
The 903 Residences
SOLD

The 903 Residences
- Location: Providence, Rhode Island
- Type: 231 Units – Luxury Condominiums
- Status: Market Rate Rental
- Misc: Selling Condominiums Individually
Timberwood Commons
SOLD

Timberwood Commons
- Location: Lebanon, New Hampshire (Adjacent to Dartmouth Hitchcock Medical Center)
- Type: 252 Units – Class A Garden Apartments
- Status: Market Rate Rental – New Construction
- Misc: Opened December, 2011 Sold June, 2014
EnVision Hotel Boston
SOLD

EnVision Hotel Boston
- Location: Boston, Massachusetts
- Type: 41 Rooms – Boutique Hotel
- Status: Rehabilitation – New Construction
- Misc: Opened August, 2012 Sold April, 2014